Back in September/October of 2014 we decided to do some house renovations.
It took a while to get things sorted out, as to how we were going to do things, but with some help from really good friend`s. Matt Bridson with his building experience and Tony Jenkinson who drew up the plans for the shire, we started our journey.

We first put the plan`s in and they were accepted, then it was to start making a list of everything we needed and getting it together.

Allan started making all the frame work for the walls, and I rang around for different things.

We then decided to add more bench space into the kitchen and put a new sink and bench top`s in, these were done back in October 2014 by our local carpenter Jeramy Carter.





Finally everything was in place and we ready to begin, with the help from Allan`s sister Kathy and brother-in-law Tim.
 Footings all dug ready for the concrete
 Front wall exposed ready for moving.
 More footings
Concrete has arrived
 Byron with the first barrow load
 Tim, Roy, Byron & Allan half way 
Roy, Allan & Tim
There was extra concrete left over so this went to do the floor in the tractor shed.

 Allan in the chook yard gateway leveling out the cement & the tractor shed.
The lazy way to level it out the tractor comes in handy.

 The Ratty dog loves disappearing so we have to look for him...
 Tim, Pat & Allan ready to shift this wall.
Tim, Allan & Pat
 All walls moved
 Cladding starts
New room wall frames

 They have been a wonderful help, without them we could never have done it all. Thank you so much. There will be more to follow later.